Weekly Update 22/04/2020 Discussion

A few answers:

The updates are to the lens module not the lens itself.

We did do a number of pcb panels but did make a couple of changes to it. (the changes were definitely a good thing for the future). All the panels get separated, inspected and run through numerous tests.

8KX electrical passing the pcb inspections and panelizing tests is indeed a big deal.

Multiple demos are constructed with parts to build a lot more. Demos like these are used to verify the assembly process among other things.

Plan F doesn’t state 100%, I’m told there are a couple or so that haven’t been shipped or in process.

8 Likes